Client task
The client first came to us to connect a professional dishwasher. During the site survey, we found that the existing water supply and drainage systems needed upgrading — otherwise the equipment wouldn't run properly.
After the engineering work, the client trusted us to complete the renovation of the entire café. Work on the site was already underway, but the previous pace made it impossible to open on time. Our job was to close out the full scope of work quickly and get the space ready for operation.
Constraints and risks
Tight timeline — just 7 days
Full scope of construction, engineering, and finishing work
Several types of work running in parallel
Preparing the space for opening without moving the scheduled date
What was done
Upgraded the water supply and drainage systems and connected a professional dishwasher
Prepared and painted the ceiling
Applied a decorative plaster finish to the walls
Fully replaced the lighting fixtures
Restored the bar counter
Rebuilt the built-in drywall structures and bar shelving
Installed a split air-conditioning system
Ran additional electrical lines for the equipment and new loads
Restored the building's façade